Good news for Mumbai: First cable-stayed bridge to open next month, check cost, latest features
December 20, 2024 20:26 ISTMumbai: With six-lane structure and a pedestrian walkway, the cable-stayed overbridge spans 385 meters and costs Rs 2.73 billion. The bridge construction project started on February 14, 2022, under the MRIDC and will be an important infrastructure for Maharashtra.