Thursday, December 19, 2024
Advertisement

ATAL TUNNEL ROHTANG NEWS IN ENGLISH

  • Atal tunnel rohtang

    Inaugurated 3 days ago, Atal Tunnel reports 3 accidents due to rash driving, race for selfies

    India | October 06, 2020 20:11 IST

    Three accidents were reported in a single day after the world's longest highway tunnel—Atal Rohtang Tunnel was inaugurated by the Prime Minister on October 3. The accidents were recorded by the CCTV cameras installed inside the tunnel. 

  • PM Modi inaugurates Atal Tunnel in Himachal Pradesh

    PM Modi inaugurates Atal Tunnel in Himachal Pradesh's Rohtang

    News | October 03, 2020 13:13 IST

    Atal tunnel will give new strength to India's border infrastructure. It is an example of world-class border connectivity. There have been demands to improve border infrastructure but for a long time, such projects either couldn't get out of planning stage or got stuck midway: PM Modi


  • PM Modi inaugurates Atal Tunnel in Rohtang

    PM Modi inaugurates Atal Tunnel in Rohtang

    News | October 03, 2020 11:16 IST

    The strategically important all-weather Atal Tunnel, the longest highway tunnel in the world, has been inaugurated by Prime Minister Narendra Modi. The 9.02 km-long tunnel connects Manali to Lahaul-Spiti valley throughout the year. It reduces the road distance by 46 kilometers between Manali and Leh and the time by about 4-5 hours. The Tunnel is built with ultra-modern specifications in the Pir Panjal range of Himalayas at an altitude of 3000 meters (10,000 Feet) from the Mean Sea Level (MSL).

  • PM Modi to inaugurate Atal Tunnel in Rohtang today

    PM Modi to inaugurate Atal Tunnel in Rohtang today

    News | October 03, 2020 9:14 IST

    The strategically important all-weather Atal Tunnel, the longest highway tunnel in the world, will be inaugurated by Prime Minister Narendra Modi today. The 9.02 km-long tunnel connects Manali to Lahaul-Spiti valley throughout the year. The inauguration will take place at 10 am today. It reduces the road distance by 46 kilometers between Manali and Leh and the time by about 4-5 hours. The Tunnel is built with ultra-modern specifications in the Pir Panjal range of Himalayas at an altitude of 3000 meters (10,000 Feet) from the Mean Sea Level (MSL).

Advertisement
Advertisement
Advertisement
Advertisement