The CAG report consists of the results of the Performance Audit on “Allocation of coal blocks and Augmentation of Coal Production”.
There was a widening gap between demand and domestic supply of coal and at the same time increasing imports of coal.
The CAG Report criticized the sales procedure that was followed and said the allocation of coal fields “lacked transparency and objectivity.