Waterlogging, Power Cut, Delayed Flights Dog Mumbai Airport
June 09, 2010 12:55 ISTFlight operations at the Mumbai airport were severely affected on Wednesday due to the closure of main runway, coupled with water-logging at terminal 1-C and power cut. There was a delay of one to one