The Noida Metro Rail Corporation (NMRC) has invited tenders for Aqua line extension as part of 14.958-km long Sector - 51 to Knowledge Park - V corridor with 9 Stations. The latest tender is for developing 5 metro stations on this route in the first phase. The proposed Aqua line extended route will connect Noida Sector 51 with Greater Noida's Sector 2.
The 14.95-km long Aqua line extention project was approved by the Uttar Pradesh cabinet in December 2019. In total, the route will comprise 9 new stations between Sector 51 to Knowledge Park 5 in Greater Noida. However, in the first phase, the NMRC has invited tender for constructing 5 metro stations.
The first phase will be of 9.15 km long and will have 5 stations including Sector 122 and Sector 123 in Noida and Sector 4, Ecotech 12 and Sector 2 in Greater Noida.
While in the second phase, there will be four metro stations that will be built on a 5.8 km stretch. These stations will be in Greater Noida’s Sector 3, Sector 10, Greater Sector 12 and Knowledge Park 5.
ALSO READ | New Motor Vehicle Rules: What all changes from Oct 1 in terms of carrying driving license, RC, Insurance
ALSO READ | Delhi-Meerut rapid rail: All you need to know about Bombardier's semi-high speed train coaches for RRTS
Latest India News