The tree occupies the central portion of the campus and all faculty blocks are situated around it.
When the CMRL was approached for help, environment specialists working for Metro Rail happily agreed.
“A huge pit was dug with 15 metre circumference and five metre depth.
Unfortunately, heavy rain filled the pit with water. Fire service personnel were called who helped in draining water from the pit,” said K Elanthiraiyan, Public Relations Officer, Chennai Metro Rail Limited.
The branches of the tree were then pruned to reduce the weight and plant medicine was sprayed to prevent degeneration of roots, especially in a new location. Also, hormones were applied to the root ends, he said.
“With the help of two 50 ton hydraulic cranes, an excavator and a backhoe loader, the tree was lifted and transplanted in the pit (about 15 feet away) and it was covered with earth for adequate support. The whole operation took 48 hours,” he said.
The tree had a girth of 11 metres and weighed 20 tonnes after removal of branches. Now after a few weeks of transplantation, new aerial roots and sprouts are seen, indicating the success of the shifting exercise.
Hospital authorities also thanked the Tamil Nadu Fire Services personnel,college staff and students for their active participation in the transplantation exercise.
Latest India News