A follow up study in 2009detected 49,600 ppm as the highest level of lead and a third study in 2011 detected 34,700 ppm of lead as the highest concentration.
Painted surfaces deteriorate with time or when disturbed, and lead from the paint then contaminates household dust and soils surrounding the home.
Latest India News